HARMONY APARTMENTS MULTI-FAMILY / HIGH-RISE RESIDENTIAL HARMONY APARTMENTS ISLAMABAD, PAKISTAN CLIENT: Malik Aslam (Capital Smart City Islamabad)COVERED AREA: 489,000 ft² PROJECT DESCRIPTION HVAC: 1690 tons Variable Refrigerant Flow (VRF) Based Cooling System for apartment.Plumbing: Water supply. Drainage work.Electrical: 3.89 MW Electrical Load & Allied works.Fire Fighting: 1500 GPM Sprinkler. Fire Hydrant & FHC System and Fire Extinguishers.
LAHORE HILLS
LAHORE HILLS MULTI-FAMILY / HIGH-RISE RESIDENTIAL LAHORE HILLS LAHORE, PUNJAB, PAKISTAN CLIENT: One Canal- Lahore Hills by Diyar HomesCOVERED AREA: 249,100 ft² PROJECT DESCRIPTION HVAC: 899 tons Variable Refrigerant Flow (VRF) Based Cooling System for apartment.Plumbing: Water supply. Drainage work.Electrical: 1.83 MW Electrical Load & Allied works.Fire Fighting: 1500 GPM Sprinkler, Fire Hydrant & FHC System and Fire Extinguishers.
PRIME TOWER – A, B, C & D
PRIME TOWER – A, B, C & D MULTI-FAMILY / HIGH-RISE RESIDENTIAL PRIME TOWER – A, B, C & D ISLAMABAD, PAKISTAN CLIENT: Shoib Malik & Al-Ghurair Giga Pakistan (Pvt.) Ltd.COVERED AREA: 225,000 ft² PROJECT DESCRIPTION HVAC: 800 X 4-3200 tons VRF based Individual Apartment Cooling System.Plumbing: Water supply and Drainage work.Electrical: 1.7 X 4 = 6.8 MW Electrical Load & Allied works.Fire Fighting: 1000 GPM Sprinkler, Fire Hydrant & FHC System and Fire Extinguishers.
60 – L (APARTMENT BUILDING)
60 – L (APARTMENT BUILDING) MULTI-FAMILY / HIGH-RISE RESIDENTIAL 60 – L (APARTMENT BUILDING) LAHORE, PUNJAB, PAKISTAN CLIENT: Zaheer Ahmad khan Architect & Mohsin Naqvi (Mapel Leaf Group)COVERED AREA: 245,000 ft² PROJECT DESCRIPTION HVAC: 1140 tons VRF based Central Cooling System.Plumbing: Water supply and Drainage work.Electrical: 2.1 MW Electrical Load & Allied works.Fire Fighting: Fire Hydrant & FHC System and Fire Extinguishers.