TABUK PLAZA RETAIL & COMMERCIAL BUILDINGS TABUK PLAZA TABUK, SAUDI ARABIA CLIENT: Sarah Technical CoCOVERED AREA: 276,973 ft² PROJECT DESCRIPTION HVAC: 980 tons air cooled reversible electric operated screw based central cooling system for complete building.Plumbing: Water supply, drainage work & medical gases.Electrical: 2.81 MW electrical load 8 allied works.Fire Fighting: 1250 GPM Sprinkler, Fire Hydrant 8 FHC System and Fire Extinguishers.
FOOD COURT, STAR AVENUE
FOOD COURT, STAR AVENUE RETAIL & COMMERCIAL BUILDINGS FOOD COURT, STAR AVENUE JEDDAH, SAUDI ARABIA CLIENT: Al Aiban GroupCOVERED AREA: 54,574 ft² PROJECT DESCRIPTION HVAC: 408 tons Packaged Type system for complete building.Plumbing: Water supply and drainage work.Electrical: Electrical load & allied works.Fire Fighting: Sprinkler, Fire Hydrant & FHC System and Fire Extinguishers.
JAWARHAT AL ABHA
JAWARHAT AL ABHA RETAIL & COMMERCIAL BUILDINGS JAWARHAT AL ABHA ABHA, SAUDI ARABIA CLIENT: Arabian CentersCOVERED AREA: 472,170 ft² PROJECT DESCRIPTION HVAC: 1950 tons air cooled reversible electric operated screw based central cooling system & Package Units.Plumbing: Water supply and drainage work.Electrical: 4.2 MW electrical load & allied works.Fire Fighting: 1500 GPM Sprinkler, Fire Hydrant & FHC System and Fire Extinguishers.
MADINAH BOULEVARD
MADINAH BOULEVARD RETAIL & COMMERCIAL BUILDINGS MADINAH BOULEVARD MADINAH, SAUDI ARABIA CLIENT: Arabian CentersCOVERED AREA: 638,337 ft² PROJECT DESCRIPTION HVAC: 2980 tons air cooled reversible electric operated screw based central cooling system for complete building.Plumbing: Water supply. drainage work & recycling of water.Electrical: 6.3 MW electrical load 6 allied works.Fire Fighting: 1830 GPM Sprinkler, Fire Hydrant 6 FHC System and Fire Extinguishers.