TABUK PLAZA

TABUK PLAZA

TABUK, SAUDI ARABIA

CLIENT: Sarah Technical Co
COVERED AREA: 276,973 ft²

PROJECT DESCRIPTION

HVAC: 980 tons air cooled reversible electric operated screw based central cooling system for complete building.
Plumbing: Water supply, drainage work & medical gases.
Electrical: 2.81 MW electrical load & allied works.
Fire Fighting: 1250 GPM Sprinkler, Fire Hydrant & FHC System and Fire Extinguishers.