EGGSPECTATION

Client

Mr. Zarar

Area

16,000 ft2

Scope of Work

Complete HVAC, Plumbing, Fire Protection and Top Supervision.

Installed System Details

HVAC : 90 tons Variable Refrigrant Flow (VRF) based Cooling System.
Plumbing : Water supply and Drainage work.
Electrical : 175 KW Electrical Load & Allied Works.
Fire Fighting : Fire Extinguishers and ANSUL System.

Our Approach And Solution

The expansion includes eight additional wide-body gates, four jet bridge gates and four remote stand operation bus gates to increase capacity in the international terminal. The new restaurants and bars, retail areas, digital art and pet relief area improve the passenger experience. An iconic showpiece within the expansion is an island forest, complete with three live hemlock trees and contained within an open-air glass atrium.

x
graviton construction

Nam augue velit, fermentum sed erat non, efficitur interdum lectus. Donec hendrerit lorem a dui euismod tempus. Vivamus auctor blandit tellus et interdum.

contact us

Address: 37 San Juan Lane, Graaf Florisstraat 22A,3021 CH

Call Us: +1.809.120.6705

Mail: Gracontruction@gmail.com

Open Hour: 8.00 Am – 17.00 Pm

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare