SAKAKA S.S (KSA)
Kingdom of Saudi Arabia

CLIENT : Holy Rock Green Field KSA (Saudi Electric Company Govt.)
COVERED AREA : 50,175 ft²

PROJECT DESCRIPTION
Building comprises of GIS Hall, Control Room, SWGR Hall, Communication Room etc. (B+G). Detailed Design of HVAC, Plumbing and Fire Protection as per ASHRAE, ASPE, IPC, UPC, NFPA and local practices.

SCOPE OF WORK
Complete HVAC, Plumbing, Fire Protection and Detailed Resident Supervision..

INSTALLED SYSTEM DETAILS
HVAC : 155 Ton Roof top Package Air conditioning units.
Plumbing : Water supply and Drainage work.
Fire Fighting : Novec Gas system.