NEW LAND SCHOOL
Faisalabad, Punjab, Pakistan

CLIENT : MSA-RA
COVERED AREA : 189,000 ft²

PROJECT DESCRIPTION
Building comprises of Class Rooms & Other facilities (LG+GF+2F). Detailed Design of HVAC, Plumbing, Fire Protection and Electrical as per ASHRAE, ASPE, IPC, UPC, NFPA, IEEE codes & standards and local practices.

SCOPE OF WORK
Complete HVAC, Plumbing, Fire Protection & Electrical design and Top Supervision.

INSTALLED SYSTEM DETAILS
HVAC : 345 Tons VRF based Central Cooling System.
Plumbing : Water supply and Drainage work.
Electrical : 450 KW Electrical load & Allied works.
Fire Fighting : Wet pipe Sprinkler System.